| Drawing of Record Submitted | 8/20/2009 |
|---|---|
| Electronic Drawing | 8/20/2009 |
| Final Grading Report | 8/20/2009 |
| Date Scheduled | 8/25/2009 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 8/27/2009 Approved per Dennis Wright |
| Water | 8/26/2009 Corrections required per Kevin Condie..1. Record of drawing that shows H20 2. Meter box lid on lot #5 not approved lid. 3. No water to lot 5 & 4. Lot #1 box is not approved in system. 5. Clean & paint hydrant 2/1/2010 Approved per Kevin Condie |
| Wastewater | 8/26/2009 Corrections required per Kevin Condie..1. Record of drawing that shows H20 2. Meter box lid on lot #5 not approved lid. 3. No water to lot 5 & 4. Lot #1 box is not approved in system. 5. Clean & paint hydrant 2/1/2010 Approved per Kevin Condie |
| Engineering | 8/26/2009 Corrections required.. Per Brandon Wright..1. Missing class 1 and class 2 monument 2. Need property corners set front & rear of all 6 lots 2/1/10 approved per Brandon W. |
| City Development Engineer | 8/25/09 corrections required per Cathy H. Electronic DWG of record - clean up text overwriting. Language for ditch text in there twice and pointing at different locations. Show locations of straw waddles. 1/28/2010 approved per Cathy H. Electronic DWG of Record - OK. |
| Landscaping | 8/25/09 approved per Cathy H. |
| General Comments: | |