Drawing of Record Submitted |
1/19/2010 |
Electronic Drawing |
1/19/2010 |
Final Grading Report |
1/13/2010 |
Date Scheduled |
1/20/2010 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
12/15/09 approved per Kevin C -. |
Wastewater |
12/15/09 approved per Kevin C -. |
Engineering |
12/10/2009 Approved per Brandon Wright..Final to be completed before CO is issued |
City Development Engineer |
12/10/09 Corrections required per Cathy H. Plat and bond to be in place PRIOR to building permit issuance. |
Landscaping |
12/10/09 Corrections required per Cathy H. Plat and bond to be in place PRIOR to building permit issuance. |
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
1/22/2010 Approved per Kevin Condie
2/7/2011 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
1/22/2010 Approved per Kevin Condie
2/7/2011 Approved per Kevin Condie.. 1 year warranty |
Engineering |
1/20/2010 Corrections required per Brandon Wright.. Bond needs to be in place, Grout DI boxes
3/10/10 approved per Brandon W.
1/18/2011 Corrections required per Brandon Wright. 1 year warranty.. Settling spsot on Capri Drive in Asphalt |
City Development Engineer |
1/20/2010 corrections required per Cathy H. Cannot open electronic DWG of record. Boulder faced slope compliance letter is incorrect - the wall along lots 101-103 is conc. - Revise letter. Need 10% warranty bond.
3/10/10 approved per Cathy H.
1/18/2011 Corrections required per Brett B.. Asphalt settling on Capri Dr |
Landscaping |
1/20/2010 approved per Ken B.
1/18/2011 Approved per Brett Bingham 1 year warranty |
| |
General Comments: |
|