[Las Colinas Phase 2]
Number: Grading-41265

Drawing of Record Submitted 1/19/2010
Electronic Drawing 1/19/2010
Final Grading Report 1/13/2010
Date Scheduled 1/20/2010
BUILDING PERMIT RELEASE APPROVALS
Power
Water 12/15/09 approved per Kevin C -
Wastewater 12/15/09 approved per Kevin C -
Engineering 12/10/2009 Approved per Brandon Wright.. Final to be completed before CO is issued
City Development Engineer 12/10/09 Corrections required per Cathy H. Plat and bond to be in place PRIOR to building permit issuance.
Landscaping 12/10/09 Corrections required per Cathy H. Plat and bond to be in place PRIOR to building permit issuance.
FINAL INSPECTION RELEASE APPROVALS
Power
Water 1/22/2010 Approved per Kevin Condie 2/7/2011 Approved per Kevin Condie.. 1 year warranty
Wastewater 1/22/2010 Approved per Kevin Condie 2/7/2011 Approved per Kevin Condie.. 1 year warranty
Engineering 1/20/2010 Corrections required per Brandon Wright.. Bond needs to be in place, Grout DI boxes 2/1/10 corrections required per Brandon W - Still need bond. 3/10/10 approved per Brandon W. 1/18/2011 Corrections required Per Brandon Wright.. 1 year warranty Settling spot on Capri Drive in asphlat
City Development Engineer 1/20/2010 corrections required per Cathy H. Cannot open electronic DWG of record. Boulder faced slope compliance letter is incorrect - the wall along lots 101-103 is conc. - Revise letter. Need 10% warranty bond. 3/10/10 approved per Cathy H. 1/18/2011 Corrections required Per Brett Bingham 1 yer warrant.. Asphalt settling on Capri
Landscaping 1/20/2010 approved per Ken B. 1/18/2011 Approved per Brett Bingham 1 year warranty
    
General Comments: