[Fort Pierce #99/Wilkerson Elect]
Number: Grading-41400

Drawing of Record Submitted 5/7/2010
Electronic Drawing 5/7/2010
Final Grading Report 5/7/2010
Date Scheduled 5/10/2010
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/10/2010 Corrections required per Kevin Condie..Clean trash out of meter box, need to check wire, clean & paint hydrant,check all valve for open,NOTE: For the CO.. the back flow on Fire system & landscping will need to be tested. 6/7/2010 Approved per Darrin Judd..Hydrant painted wire ok, valves open outside back flow ok.. need to check inside Fire Riser on CO for Shell.
Wastewater 5/10/2010 Corrections required per Kevin Condie..Clean trash out of meter box, need to check wire, clean & paint hydrant,check all valve for open,NOTE: For the CO.. the back flow on Fire system & landscping will need to be tested. 6/7/2010 Approved per Darrin Judd..Hydrant painted wire ok, valves open outside back flow ok.. need to check inside Fire Riser on CO for Shell.
Engineering 5/10/2010 Corrections required per Brandon Wright.. Landscape rock in road needs to be place N.O.T. needs to be filed 6/9/2010 Approved per Brandon Wright 4/11/2011 Approved per Brandon Wright 1 year warranty
City Development Engineer 5/10/10 corrections required. per Cathy H. Electronic DWG of record OK. per Ken B - Gravel piles in the street (Venture). Exterior electric at corner are incomplete. Front entrance gate is missing, side and back gates also. Exterior lighting is incomplete. Utility trailer and portable dumpster are still on site. Port-a-pot still on site. 6/4/10 corrections required per Ken B. Concrete pad in front still has forms. Rear gate is missing from drive. Side and rear gate control pads still have forms. Gate control units are missing. Temp. business sign at intersection is blocking sight triangle. 6/15/2010 Approved per Cathy H 4/6/2011 Approved per Brett B .. 1 year warranty
Landscaping 5/10/2010 Corrections required per Cathy H. & Millie C..Per Millie C..Park Planning.. Trail acceptable have landscaper put exposed irrigation wires at Driveway unto a round plastic irrigation box.. Landscape is in complete through out project area. 6/10/10 corrections required per Millie C. Installation contractor to write letter certifyig installation per approved plan. Suggest remove single stake on trees and only stake as needed. 6/15/2010 Approved per Cathy H 4/6/2011 Approved per Brett B .. 1 year warranty
    
General Comments: