| Drawing of Record Submitted | 9/13/2010 |
|---|---|
| Electronic Drawing | 9/13/2010 |
| Final Grading Report | 9/13/2010 |
| Date Scheduled | 9/15/2010 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 9/15/2010 Approved per Dennis Wright 8/9/11 - 1 year warranty - approved per Dennis W. |
| Water | 9/16/2010 Corrections Required per Kevin Condie..Turn hydrant 180°, put in ballard by hydrant, landscape back flow needs tobe tested 9/27/2010 Approved per Kevin Condie 8/22/11 - 1 year warranty - approved per Kevin C. |
| Wastewater | 9/16/2010 Corrections Required per Kevin Condie..Turn hydrant 180°, put in ballard by hydrant, landscape back flow needs tobe tested 9/27/2010 Approved per Kevin Condie 8/22/11 - 1 year warranty - approved per Kevin C. |
| Engineering | 9/15/10 corrections required per Lonnie Sullivan. Southeast parking stall needs asphalt. - 9' park stall - this one is 5' to 7'. Dumpster enclosure not built. No in and out arrows on the 900 South Entrance way. Water way @ the back east of building needs asphalt to the back of waterway. 9/27/2010 Approved per Lonnie Sullivan 8/9/2011 Approved Per Lonnie S.. 1 yr warranty |
| City Development Engineer | 9/20/10 corrections required. per Wes Jenkins DWG of record okay. per Brett B - garbage enclosure doors are missing. 9/23/2010 Corrections required per Brett Bingham.. Trash enclosure still missing doors 10/14/10 approved per Brett B. |
| Landscaping | 9/20/10 corrections required per Brett B. Landscaping next to the building is not complete. 9/23/2010 Corrections required per Brett Bingham.. Landscaping still not complete 10/12/2010 Approved Per Brett Bingham.. Landscape ok |
| General Comments: | |