[Fire Station #8]
Number: Grading-42082

Drawing of Record Submitted 5/12/2011
Electronic Drawing e-mailed
Final Grading Report 5/4/2011
Date Scheduled 5/05/2011
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/05/2011 Corrections required per Kevin Condie.. 1. In Pioneer Road the line size is a 12" pipe not 16" change in concrete collar 2. Clean & paint hydrant from top to top of concrete 3. Put handle on meter setter 4. Put line isize on fire line & hydrant For CO need all back flows tested. 5/17/11 corrections required per Kevin C. Finish punch list. 5/25/11 approved per Kevin C. 5/8/2012 Approved per Kevin Condie.. 1 yr warranty
Wastewater 5/05/2011 Corrections required per Kevin Condie.. 1. In Pioneer Road the line size is a 12" pipe not 16" change in concrete collar 2. Clean & paint hydrant from top to top of concrete 3. Put handle on meter setter 4. Put line isize on fire line & hydrant For CO need all back flows tested. 5/17/11 corrections required per Kevin C. Finish punch list. 5/25/11 approved per Kevin C. 5/8/2012 Approved per Kevin Condie.. 1 yr warranty
Engineering 5/5/11 corrections required per Brandon W. Shoulder sidewalk on Pioneer Rd where landscape ends. Patch walk at chipped spots. Need verification of N.O.T. from state. Remove pile of road base on lot across street. 5/12/11 corrections required per Brandon W. Final list needs to be completed. 5/23/11 corrections required per Cathy H. General site cleanup - remove piles of dirt in curb and gutter and spray off mulch in front. Remove and re-stripe Pioneer Rd - contact Brandon Wright (703-0132). Remove port-a-pot and install roadbase ramp at end of curb and gutter. On West side where roof drains come through face of curb, remove brown silicon and replace with gray sica flex. 6/7/2011 Corrections required per Cathy H. Brandon Wright.. Re-stripe Pioneer (Call Brandon Wright if you have questions 703-0132)Settlement of Utility trench in East Parking lot straight out from North sidewalk between island & first stall ( shown by lot on asphalt 6/28/2011 Approved per Brandon Wright.. NOTE: From conversation with Kevin Taylor we will watch settled area for 1 year and check then. 4/06/2012 Approved per Brandon Wright.. 1 year waranty
City Development Engineer 5/5/11 approved per Brett B. 4/10/2012 Approved per Wes Jenkins.. 1 year warranty
Landscaping 5/13/2011 Corrections required per Millie Cockerill. Clean off rocks 2. Velocity spray down mulch prior to May 26 3. Add T Christie tags to valved 4. Remove ribbon, nursery stakes, tape weds, trash 5. Mulch around Wesstide drain box 6. As- Builts 5/23/11 corrections required per Millie Cockerill. Spreadout pampus grass to 6' o.c. Rake mulch in front and water down to remove built up dirt. Re-tie one tree along Pioneer. Remove trash, weeds and fallen rocks from landscape area. 6/7/2011 Corrections required per Mille C. Park Planning: Move Pampas grass to location of empty pot needs to be 6' oc @ group across from Ada stalls , irrigation controller antenna-6/7/11 M Cockerill 6/30/2011 Approved per Millie..Landtrends will replace hand held redio TK 21709 with correct model TK 3170 4/10/2012 Approved per Wes Jenkins.. 1 year warranty
    