| Drawing of Record Submitted | 9/10/2010 |
|---|---|
| Electronic Drawing | 9/10/2010 |
| Final Grading Report | not needed |
| Date Scheduled | 9/13/2010 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 9/13/2010 Approved per Dennis Wright |
| Water | 9/15/2010 Corrections required per Kevin Condie.. Need to put a back flow on water in the back yard & Irr system need back flow 10/01/2010 Corrections required Per Kevin Condie..Need a backflow on water in back yard, it needs to be a RP back flow assembly, as pre-Brad City back flow tech, call to find out where it needs to go |
| Wastewater | 9/15/2010 Corrections required per Kevin Condie.. Need to put a back flow on water in the back yard & Irr system need back flow 10/01/2010 Corrections required Per Kevin Condie..Need a backflow on water in back yard, it needs to be a RP back flow assembly, as pre-Brad City back flow tech, call to find out where it needs to go |
| Engineering | 9/13/10 approved per Brandon W. |
| City Development Engineer | 9/13/10 approved per Wes Jenkins. Electronic DWG of Record okay. |
| Landscaping | 9/13/10 corrections required per Brett Bingham - Plans state that ground cover will be placed between all the plantings. Ground cover currently is not in place. 10/01/2010 Approved per Brett Bingham |
| General Comments: | |