Drawing of Record Submitted |
9/10/2010 |
Electronic Drawing |
9/10/2010 |
Final Grading Report |
not needed |
Date Scheduled |
9/13/2010 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
9/13/2010 Approved per Dennis Wright |
Water |
9/15/2010 Corrections required per Kevin Condie.. Need to put a back flow on water in the back yard & Irr system need back flow
10/01/2010 Corrections required Per Kevin Condie..Need a backflow on water in back yard, it needs to be a RP back flow assembly, as pre-Brad City back flow tech, call to find out where it needs to go |
Wastewater |
9/15/2010 Corrections required per Kevin Condie.. Need to put a back flow on water in the back yard & Irr system need back flow
10/01/2010 Corrections required Per Kevin Condie..Need a backflow on water in back yard, it needs to be a RP back flow assembly, as pre-Brad City back flow tech, call to find out where it needs to go |
Engineering |
9/13/10 approved per Brandon W. |
City Development Engineer |
9/13/10 approved per Wes Jenkins. Electronic DWG of Record okay. |
Landscaping |
9/13/10 corrections required per Brett Bingham - Plans state that ground cover will be placed between all the plantings. Ground cover currently is not in place.
10/01/2010 Approved per Brett Bingham |
| |
General Comments: |
|