| Drawing of Record Submitted | 3/29/2012 |
|---|---|
| Electronic Drawing | 3/29/2012 |
| Final Grading Report | 3/29/2012 |
| Date Scheduled | 04/05/12 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 4/06/2012 Corrections required per Kevin Condie.. Not Ready 5/31/2013 Corrections required per Kevin Condi.. Not Ready |
| Wastewater | 4/06/2012 Corrections required per Kevin Condie.. Not Ready 5/31/2013 Corrections required per Kevin Condi.. Not Ready |
| Engineering | 6/05/2013 Approved Per Lonnie Sullivan.. Quality needs to pave the SMA on the udot section or exit 6 under stucturn to R/W fence N.S the City side are complete as per plan |
| City Development Engineer | |
| Landscaping | |
| General Comments: | |
| Final for Desert Canyon Parkway: From Southern Parkway to Ft. Pierce Bridge | |