Drawing of Record Submitted |
3/29/2012 |
Electronic Drawing |
3/29/2012 |
Final Grading Report |
3/29/2012 |
Date Scheduled |
04/05/12 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
4/06/2012 Corrections required per Kevin Condie.. Not Ready
5/31/2013 Corrections required per Kevin Condi.. Not Ready |
Wastewater |
4/06/2012 Corrections required per Kevin Condie.. Not Ready
5/31/2013 Corrections required per Kevin Condi.. Not Ready |
Engineering |
6/05/2013 Approved Per Lonnie Sullivan..
Quality needs to pave the SMA on the udot section or exit 6 under stucturn to R/W fence N.S the City side are complete as per plan |
City Development Engineer |
|
Landscaping |
|
| |
General Comments: |
Final for Desert Canyon Parkway: From Southern Parkway to Ft. Pierce Bridge |