Drawing of Record Submitted |
11/05/2010 |
Electronic Drawing |
11/05/2010 |
Final Grading Report |
11/05/2010 |
Date Scheduled |
11/10/2010 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
11/10/2010 Approved per Dennis Wright |
Water |
11/15/2010 Approved per Kevin Condie.. Did not change water |
Wastewater |
11/15/2010 Approved per Kevin Condie.. Did not change water |
Engineering |
11/10/2010 Corrections required Per Lonnie Sullivan..The sub contractor is working on enclosing 2 Drive approaches 1- one the east & one the West there will be a wall built to fill in these spaces. The parking area around the building need ot be paved and the sub contractor is working on this. A parking lot drain system is being put in as well
11/29/2010 Approved perLonnie Sullivan |
City Development Engineer |
11/15/2010 Corrections required per Brett Bingham..Site not done no asphalt
11/24/2010 Approved per Brett Bingham |
Landscaping |
11/15/2010 Corrections required per Brett Bingham.. Site not done, no asphalt
11/24/2010 Approved per Brett Bingham |
| |
General Comments: |
|