[Sun River Phase 31]
Number: Grading-42623

Drawing of Record Submitted 5/10/2011
Electronic Drawing emailed to Lonnie B
Final Grading Report 5/10/2011
Date Scheduled 5/12/2011
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/17/11 correction required per Kevin C. Wire okay. Fire hydrant clean and painted okay. Need to check valve and meter setters. 5/23/11 approved per Kevin C. 3/06/2012 Corrections required Per Kevin Condie.. 1 year warranty .. Meter box pad broken at 1427 W Morane Manor Dr
Wastewater 5/17/11 correction required per Kevin C. Wire okay. Fire hydrant clean and painted okay. Need to check valve and meter setters. 5/23/11 approved per Kevin C. 3/06/2012 Corrections required Per Kevin Condie.. 1 year warranty .. Meter box pad broken at 1427 W Morane Manor Dr
Engineering 5/12/11 approved per Lonnie Sullivan. 3/02/2012 Approved Per Lonnie S 1 year warrant..Please Note:.. This is a private sub division the asphalt is cracking in the road ways some cracking in the curb and some plants are dead
City Development Engineer 5/17/11 approved per Brett B. 3/02/2012 Approved per Lonnie S.. Please Note:.. This is a private sub division the asphalt is cracking in the road ways some cracking in the curb and some plants are dead
Landscaping 5/17/11 approved per Brett B. 3/02/2012 Approved per Lonnie S 1 year warranty Please Note:.. This is a private sub division the asphalt is cracking in the road ways some cracking in the curb and some plants are dead
    
General Comments: