| Drawing of Record Submitted | 7/28/2011 |
|---|---|
| Electronic Drawing | 7/28/2011 |
| Final Grading Report | 7/28/2011 |
| Date Scheduled | 8/01/2011 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 8/5/11 corrections required per Kevin C. Turn and pain hydrant. Pour pad around hydrant. Need to check wire. 8/16/11 approved per Kevin C. 6/5/12 - 1 year warranty corrections required per Kevin C. Need one more year after final on Phase 4 of Silkwood because Quality dug into street for utilities. 6/21/13 - 1 year warranty - approved per Kevin C. |
| Wastewater | 8/5/11 corrections required per Kevin C. Turn and pain hydrant. Pour pad around hydrant. Need to check wire. 8/16/11 approved per Kevin C. 6/5/12 - 1 year warranty corrections required per Kevin C. Need one more year after final on Phase 4 of Silkwood because Quality dug into street for utilities. 6/21/13 - 1 year warranty - approved per Kevin C. |
| Engineering | 8/2/11 corrections required per Brandon W. File NOT. Provide 10% warranty bond with city. Finish monuments. 8/15/11 approved per Brandon W. 6/4/12 - 1 year warranty - corrections required per Brandon W. Need additional year warranty on Crimson Ridge Dr for Silkwood Phase 4. 10/25/13 - 1 year warranty - approved per Wes Jenkins. |
| City Development Engineer | 8/15/11 approved per Brett B. 10/25/13 - 1 year warranty - approved per Wes Jenkins. |
| Landscaping | 8/15/11 approved per Brett B. 10/25/13 - 1 year warranty - approved per Wes Jenkins. |
| General Comments: | |