Drawing of Record Submitted |
6/04/2013 -10/01/2013 revised |
Electronic Drawing |
6/04/2013- 10/01/2013 revised |
Final Grading Report |
6/19/2013 |
Date Scheduled |
6/20/2013 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
6/21/13 approved per Dennis Wright.
8/04/2014 Approved per Dennis Wright 1 year warranty |
Water |
6/21/13 corrections required per Kevin C. Meter box on lot 105, 101, 102 is low. AIV need to be 12" above finish grade with approves screen. Lot P105 has 2 setters. All hydrants need collars. No concrete on meter hydrant lot 127. Meter lid will not fit in box. Lot 102, 105 center meter setter in box. Center all setters in boxes and clean boxes out. Check all valve open. Cut off 2" blow off at end of road. We have fire hydrant for flushing. Fire hydrant may be too high - lower it. Check wire.
9/9/13 - OK per Scott Taylor |
Wastewater |
6/21/13 corrections required per Kevin C. Meter box on lot 105, 101, 102 is low. AIV need to be 12" above finish grade with approves screen. Lot P105 has 2 setters. All hydrants need collars. No concrete on meter hydrant lot 127. Meter lid will not fit in box. Lot 102, 105 center meter setter in box. Center all setters in boxes and clean boxes out. Check all valve open. Cut off 2" blow off at end of road. We have fire hydrant for flushing. Fire hydrant may be too high - lower it. Check wire.
9/9/13 - OK per Scott Taylor |
Engineering |
6/21/13 corrections required per Brandon Wright. Handicap ramp on Silver Clout and Petroglyph Dr not ADA spec. Sidewalk no complete.
8/30/2013 Approved per Brandon Wright
8/07/2014 Approved per Brandon Wright 1 year warranty |
City Development Engineer |
6/21/13 - STREETS - Approved per Jared Stewart.
9/9/13 - approved per Wes Jenkins |
Landscaping |
9/9/13 - approved per Wes Jenkins |
| |
General Comments: |
|