[Masonic Temple]
Number: Shell-34016

Drawing of Record Submitted 2/8/2011 re-vised 3/11/2011
Electronic Drawing 2/8/2011 re-vised 3/11/2011
Final Grading Report 2/8/2011
Date Scheduled 2/9/2011
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 2/9/2011 Approved per Dennis Wright 3/02/2011 Approved per Dennis Wright..1 year warranty
Water 2/11/2011 Corrections required per Kevin Condie.. Need arrow & line size in concrete collars, For CO need back flow on Irr ssprinkler system & FIre system 3/21/11 corrections required per Kevin C. Punch list is not done. 3/7/2012.. Approved per Kevin Condie.. 1 year warranty
Wastewater 2/11/2011 Corrections required per Kevin Condie.. Need arrow & line size in concrete collars, For CO need back flow on Irr ssprinkler system & FIre system 3/21/11 corrections required per Kevin C. Punch list is not done. 3/7/2012.. Approved per Kevin Condie.. 1 year warranty
Engineering 2/10/2011 Corrections required per Brandon Wright..Stop signs missing, DI Boxes need grout in floors of boxes, rail on side walk on top of rockwall on 1990 East 3/14/2011 Corrections required per Brandon Wright.. List Not complete, rail on top of rock wall not installed 4/27/2011 Approved per Brandon Wright 3/02/2012 Approved per Brandon Wright..1 year warranty
City Development Engineer 2/14/2011 Corrections required per Brett Bingham.. Drawing of records neeeds to be in City HCN 3/14/2001 Approved per Wes Jenkins
Landscaping 2/14/2011 Approved per Brett Bingham
    
General Comments: