Drawing of Record Submitted |
11/15/2011 |
Electronic Drawing |
11/15/2011 |
Final Grading Report |
11/18/2011 |
Date Scheduled |
11/21/2011 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
11/21/11 PHASE I ONLY - approved per Dennis W.
12/9/12 - 1 year warranty - approved per Dennis W. |
Water |
12/02/2011 Corrections required Per Carson Tait..Wire Is Good.. 11-28-11 Tim D.. Need to install prv valves on all incoming water lines to the buildings. Need to move the R-p assemblies out from the walls. (12" clearance minimum.) Need to install a hose bib vacuum breaker on pet smart. Need to remove concrete from valve boxes and meter lids.
12/16/2011 Approved per Carson Tait.. PHASE 1 ONLY
10/16/12 - 1 year warranty approved per Carson Tait. |
Wastewater |
12/02/2011 Corrections required Per Carson Tait..Wire Is Good.. 11-28-11 Tim D.. Need to install prv valves on all incoming water lines to the buildings. Need to move the R-p assemblies out from the walls. (12" clearance minimum.) Need to install a hose bib vacuum breaker on pet smart. Need to remove concrete from valve boxes and meter lids.
12/16/2011 Approved per Carson Tait.. PHASE 1 ONLY
10/16/12 - 1 year warranty approved per Carson Tait. |
Engineering |
11/21/2011 PHASE 1- Corrections required per Brandon Wright.. 1. Stripping plan not complete 2. Stop signs and handicap signs not installed 3. Complete landscape 4. Crust surface empty pads 5. Warranty bond needs to be completed with City
12/16/11 PHASE I ONLY - approved per Brandon W.
10/16/12 - 1 year warranty approved per Brandon W. |
City Development Engineer |
11/21/11 PHASE I - corrections required per Wes Jenkins. Need 10% warranty bond for improvements in the public right of way.
12/16/11 PHASE I ONLY - approved per Wes J.
10/16/12 - 1 year warranty approved per Brandon W. |
Landscaping |
11/21/11 PHASE I - corrections required per Wes Jenkins. Need 10% warranty bond for improvements in the public right of way.
12/16/11 PHASE I ONLY - approved per Wes J.
10/16/12 - 1 year warranty approved per Brandon W. |
| |
General Comments: |
|