[Sun River Phase 34]
Number: Grading-42916

Drawing of Record Submitted 9/07/2012
Electronic Drawing 09/07/2012
Final Grading Report 09/07/2012
Date Scheduled 09/10/2012
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 9/10/12 corrections required per Kevin C. Need to check wire. Need to open all valves, not phase line valves. Check oil in all hydrants, fill if needed. One broken lid. Remove rebar that is sticking out into box. Cut off, no sharp edges. Put plugs in stub lines. 9/14/2012 Approved per Carson Tait 7/15/2013 Approved per Kevin Condie.. 1 year warranty
Wastewater 9/10/12 corrections required per Kevin C. Need to check wire. Need to open all valves, not phase line valves. Check oil in all hydrants, fill if needed. One broken lid. Remove rebar that is sticking out into box. Cut off, no sharp edges. Put plugs in stub lines. 9/14/2012 Approved per Carson Tait 7/15/2013 Approved per Kevin Condie.. 1 year warranty
Engineering 9/10/2012 Approved Per Brandon Wright 7/8/13 - 1 year warranty - approved per Brandon Wright.
City Development Engineer 9/12/2012 Approved per Wes Jenkins 9/13/2012 Approved per Ed Welch.. Streets Dept 7/8/13 - 1 year warranty - approved per Brandon Wright.
Landscaping 9/12/2012 Approved per Wes Jenkins 7/8/13 - 1 year warranty - approved per Brandon Wright.
    
General Comments: