[Sun Valley Phase 3]
Number: 43008

Drawing of Record Submitted 09/06/2011
Electronic Drawing 09/06/2011
Final Grading Report 9/06/2011
Date Scheduled 9/08/2011
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 9/12/2011 Corrections required per Kevin Condie..Need to check wire, West Hydrant and meter, no conrete around them. 9/13/2011 Approved per Kevin Condie 10/11/12 - 1 year warranty - approved per Kevin C.
Wastewater 9/12/2011 Corrections required per Kevin Condie..Need to check wire, West Hydrant and meter, no conrete around them. 9/13/2011 Approved per Kevin Condie 10/11/12 - 1 year warranty - approved per Kevin C.
Engineering 9/8/11 Approved per Brandon Wright 9/10/2012 Approved per Brandon Wirght.. 1yr warranty
City Development Engineer 9/8/2011 Approved per Wes Jenkins 9/10/2012 Approved per Brandon Wright.. 1 year warranty
Landscaping 9/8/11 Approved per Brandon Wright 9/10/2012 Approved per Brandon Wright.. 1 yr warranty
    
General Comments: