| Drawing of Record Submitted | 5/18/2012 |
|---|---|
| Electronic Drawing | 5/18/2012 |
| Final Grading Report | 5/18/2012 |
| Date Scheduled | 5/21/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 5/24/2012 Approved per Dennis Wright 3/7/13 - 1 year warranty - approved per Dennis W. |
| Water | 5/25/2012 Approved Per Kevin Condie 3/14/2013 Corrections required per Carson Tait.. 1 yr warranty.. Need to collar the valve in 950 West streeet back flow assembly needs to be tested and tagged Need to address sthe settling of the watermian trench in 950 West 7/21/2015 Approved per Carson Tait..1 year warranty |
| Wastewater | 5/25/2012 Approved Per Kevin Condie 3/14/2013 Corrections required per Carson Tait.. 1 yr warranty.. Need to collar the valve in 950 West streeet back flow assembly needs to be tested and tagged Need to address sthe settling of the watermian trench in 950 West 7/21/2015 Approved per Carson Tait..1 year warranty |
| Engineering | 5/25/2012 Approved per Lonnie Sullivan 7/31/2015 Approved per Carson Tait.. 1 year warranty |
| City Development Engineer | 5/23/2012 Correction required per Wes Jenkins..1. Need 10% warranty bond for public improvements. @. Need recorded deed for deceleration lane on Valley View 5/23/2012 Approved per Streets Dept.. Per Ed Welch.. no drainage in new parking lot 5/30/2012 Approved Per Wes Jenkins |
| Landscaping | Corrections required Per Wes Jenkins..1. Need 10% warranty bond for public improvements. @. Need recorded deed for deceleration lane on Valley View 5/30/2012 Approved Per Wes Jenkins |
| General Comments: | |