Drawing of Record Submitted |
5/18/2012 |
Electronic Drawing |
5/18/2012 |
Final Grading Report |
5/18/2012 |
Date Scheduled |
5/21/2012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/24/2012 Approved per Dennis Wright
3/7/13 - 1 year warranty - approved per Dennis W. |
Water |
5/25/2012 Approved Per Kevin Condie
3/14/2013 Corrections required per Carson Tait.. 1 yr warranty.. Need to collar the valve in 950 West streeet back flow assembly needs to be tested and tagged Need to address sthe settling of the watermian trench in 950 West
7/21/2015 Approved per Carson Tait..1 year warranty |
Wastewater |
5/25/2012 Approved Per Kevin Condie
3/14/2013 Corrections required per Carson Tait.. 1 yr warranty.. Need to collar the valve in 950 West streeet back flow assembly needs to be tested and tagged Need to address sthe settling of the watermian trench in 950 West
7/21/2015 Approved per Carson Tait..1 year warranty |
Engineering |
5/25/2012 Approved per Lonnie Sullivan
7/31/2015 Approved per Carson Tait.. 1 year warranty |
City Development Engineer |
5/23/2012 Correction required per Wes Jenkins..1. Need 10% warranty bond for public improvements. @. Need recorded deed for deceleration lane on Valley View
5/23/2012 Approved per Streets Dept.. Per Ed Welch.. no drainage in new parking lot
5/30/2012 Approved Per Wes Jenkins |
Landscaping |
Corrections required Per Wes Jenkins..1. Need 10% warranty bond for public improvements. @. Need recorded deed for deceleration lane on Valley View
5/30/2012 Approved Per Wes Jenkins |
| |
General Comments: |
|