Drawing of Record Submitted |
6/7/2012 |
Electronic Drawing |
6/7/2012 |
Final Grading Report |
6/7/2012 |
Date Scheduled |
6/11/2012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
6/8/12 approved per Dennis Wright.
4/2/13 - 1 year warranty approved per Dennis Wright. |
Water |
6/12/12 corrections required per Kevin C. No line sizes or arrows in valve collars. Contractor needs to show valves are open. Need to check wire. Need to mark which meter goes where.
6/14/12 approved per Kevin C.
4/8/13 - 1 year warranty approved per Kevin C. |
Wastewater |
6/12/12 corrections required per Kevin C. No line sizes or arrows in valve collars. Contractor needs to show valves are open. Need to check wire. Need to mark which meter goes where.
6/14/12 approved per Kevin C.
4/8/13 - 1 year warranty approved per Kevin C. |
Engineering |
6/11/12 approved per Brandon W.
4/09/2013 Corrections Required Per Brandon Wright.. 1 yr warranty.. Asphalt failing on Riverside and 1900 East, remove & replace 2. Sewer trench failing in site parking lot |
City Development Engineer |
6/11/12 corrections required per Wes Jenkins. 10% warranty bond REQUIRED.
6/25/12 approved per Wes Jenkins.
6/26/2012 Approved per Wes Jenkins |
Landscaping |
6/11/12 approved per Wes Jenkins. |
| |
General Comments: |
|