Drawing of Record Submitted |
3/05/2012 |
Electronic Drawing |
3/05/2012 |
Final Grading Report |
3/05/2012 |
Date Scheduled |
3/8/2012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
3/7/2012 Corrections required per Kevin Condie..1. Meter setter on lot#7 and phase 3 by hydrant setter need to be centered in box. 2. 2 setters on lot 11 arc 1" and boxes are 3/4 need 1" boxes looking for some from Sholzens need to be traffic rated
3/9/2012 Approved per Kevin Condie
1/24/2013 Approved per Kevin Comdie.. 1 year wrranty.. Nolan ok w/1" setter in 3/4 heavy boxes
1/21/2014 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
3/7/2012 Corrections required per Kevin Condie..1. Meter setter on lot#7 and phase 3 by hydrant setter need to be centered in box. 2. 2 setters on lot 11 arc 1" and boxes are 3/4 need 1" boxes looking for some from Sholzens need to be traffic rated
3/9/2012 Approved per Kevin Condie
1/24/2013 Approved per Kevin Comdie.. 1 year wrranty.. Nolan ok w/1" setter in 3/4 heavy boxes
1/21/2014 Approved per Kevin Condie.. 1 year warranty |
Engineering |
3/12/12 approved per Brandon W.
1/07/2013 Approved per Brandon Wright .. 1 Yr Warranty
1/17/2014 Approved per Brandon Wright.. 2nd Year Warranty |
City Development Engineer |
3/13/2012 Approved per Wes Jenkins
1/07/2013 Apporved Per Brandon Wright 1 yr warranty |
Landscaping |
3/13/2012 Approved per Wes Jenkins
1/07/2013 Approved per Breandon Wright |
| |
General Comments: |
|