[Escalera Phase 4]
Number: Grading-43637

Drawing of Record Submitted 3/29/2012
Electronic Drawing 03/29/2012
Final Grading Report 03/29/2012
Date Scheduled 04/02/2012
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 4/2/12 Corrections required per Dennis Wright..Not ready For Final 4/09/2012 Approved per Dennis Wright 2/6/13 - 1 year warranty - approved per Dennis W.
Water 4/4/12 corrections required per Kevin C. Turn hydrant at lot 405 & 404. No H2) in system. 4/11/2012 Approved per Kevin Condie
Wastewater 4/4/12 corrections required per Kevin C. Turn hydrant at lot 405 & 404. No H2) in system. 4/11/2012 Approved per Kevin Condie
Engineering 4/02/2012 Corrections required per Brandon Wright.. Rockwall certifications, end of road marker, monument not installed 4/12/2012 Approved per Brandon Wright 2/06/2013 Approved Per Brandon Wright.. 1 year warranty
City Development Engineer 4/2/12 corrections required per Wes Jenkins. Need 10% warranted bond for public improvements. 4/26/2012 Approved per Wes Jenkins 2/06/2013 Approved per Brandon Wright.. 1 year warranty
Landscaping 4/2/12 corrections required per Wes Jenkins. Need 10% warranted bond for public improvements. 4/26/2012 Approved per Wes Jenkins 2/06/2013 Approved per Brandon Wright.. 1 year warranty
    
General Comments: