Drawing of Record Submitted |
3/29/2012 |
Electronic Drawing |
03/29/2012 |
Final Grading Report |
03/29/2012 |
Date Scheduled |
04/02/2012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
4/2/12 Corrections required per Dennis Wright..Not ready For Final
4/09/2012 Approved per Dennis Wright
2/6/13 - 1 year warranty - approved per Dennis W. |
Water |
4/4/12 corrections required per Kevin C. Turn hydrant at lot 405 & 404. No H2) in system.
4/11/2012 Approved per Kevin Condie |
Wastewater |
4/4/12 corrections required per Kevin C. Turn hydrant at lot 405 & 404. No H2) in system.
4/11/2012 Approved per Kevin Condie |
Engineering |
4/02/2012 Corrections required per Brandon Wright.. Rockwall certifications, end of road marker, monument not installed
4/12/2012 Approved per Brandon Wright
2/06/2013 Approved Per Brandon Wright.. 1 year warranty |
City Development Engineer |
4/2/12 corrections required per Wes Jenkins. Need 10% warranted bond for public improvements.
4/26/2012 Approved per Wes Jenkins
2/06/2013 Approved per Brandon Wright.. 1 year warranty |
Landscaping |
4/2/12 corrections required per Wes Jenkins. Need 10% warranted bond for public improvements.
4/26/2012 Approved per Wes Jenkins
2/06/2013 Approved per Brandon Wright.. 1 year warranty |
| |
General Comments: |
|