[Desert Canyons Wakeboard Park]
Number: Grading-43699

Drawing of Record Submitted 6/15/2012
Electronic Drawing 6/15/2012
Final Grading Report 6/15/2012
Date Scheduled 6/19/2012
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water PRE-FINAL 6/7/12 - corrections REQUIRED for Kevin C. Concrete around hydrant and meter and raise hydrants and meter box to match grade. Test backflow on system. Valves without concrete need to be finished on Desert Canyon Pkwy. Desert Canyon Pkwy needs to be finaled. 6/19/2012 Approved per Kevin Condie.. Wakeborad Park Only Not Desert Canyons 4/8/13 - 1 year warranty - correction required per Kevin Condie. Tree planted on top of water line. REMOVE TREE.
Wastewater PRE-FINAL 6/7/12 - corrections REQUIRED for Kevin C. Concrete around hydrant and meter and raise hydrants and meter box to match grade. Test backflow on system. Valves without concrete need to be finished on Desert Canyon Pkwy. Desert Canyon Pkwy needs to be finaled. 6/19/2012 Approved per Kevin Condie.. Wakeborad Park Only Not Desert Canyons 4/8/13 - 1 year warranty - correction required per Kevin Condie. Tree planted on top of water line. REMOVE TREE.
Engineering 6/19/2012 Approved per Loniie Sullivan 4/8/13 - 1 year warranty approved per Brandon W.
City Development Engineer 6/21/2012 Approved per West Jenkins 4/8/13 - 1 year warranty approved per Brandon W.
Landscaping 6/21/2012 Approved per Wes Jenkins 4/8/13 - 1 year warranty approved per Brandon W.
    
General Comments: