| Drawing of Record Submitted | 12/04/2012 |
|---|---|
| Electronic Drawing | 12/04/2012 |
| Final Grading Report | 12/04/2012 |
| Date Scheduled | 12/05/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 12/07/2012 Approved per Dennis Wright 10/7/13 - 1 year warranty approved per Dennis Wright. |
| Water | 12/04/2012 Corrections required per Kevin Condie..Concrete around Hydrant lower then curb, may have to raise hydrant. Clean& paint hydrant, need to check wire, open all valves. 12/7/12 approved per Kevin C. 11/20/13 - 1 year warranty - approved per Kevin C. |
| Wastewater | 12/04/2012 Corrections required per Kevin Condie..Concrete around Hydrant lower then curb, may have to raise hydrant. Clean& paint hydrant, need to check wire, open all valves. 12/7/12 approved per Kevin C. 11/20/13 - 1 year warranty - approved per Kevin C. |
| Engineering | 12/6/12 corrections required per Brandon W. Site needs to be stabilized and file NOT. 12/17/12 approved per Brandon W. 10/11/2013 Approved per brandon Wright.. 1 year warranty |
| City Development Engineer | 12/05/2012 Approved per Streets Dept Only.. Vil Koloa 12/17/12 approved per Wes Jenkins. 10/25/13 - 1 year warranty - approved per Wes Jenkins. |
| Landscaping | 12/6/12 corrections required per Brandon W. Site needs to be stabilized and file NOT. 12/17/12 approved per Wes Jenkins. 10/25/13 - 1 year warranty - approved per Wes Jenkins. |
| General Comments: | |