| Drawing of Record Submitted | 6/26/2012 |
|---|---|
| Electronic Drawing | 6/26/2012 |
| Final Grading Report | 6/26/2012 |
| Date Scheduled | 6/28/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 7/3/2012 Approved per Kevin Condie.. Per Phone 6/21/13 - 1 year warranty - approved per Kevin C. |
| Wastewater | 7/3/2012 Approved per Kevin Condie.. Per Phone 6/21/13 - 1 year warranty - approved per Kevin C. |
| Engineering | 6/28/12 corrections required per Brandon W. Need warranty bond in place. 6/28/2012 Approved Streets Dept .. Per Ed Welch .. No drainage in street. 7/9/12 corrections required per Brandon W. Need warranty bond. 8/2/12 approved per Brandon W. |
| City Development Engineer | 8/2/12 approved per Brandon W. |
| Landscaping | 8/2/12 approved per Brandon W. |
| General Comments: | |