[Estates @ Hidden Valley Phase 5]
Number: Grading-43917

Drawing of Record Submitted 6/26/2012
Electronic Drawing 6/26/2012
Final Grading Report 6/26/2012
Date Scheduled 6/28/2012
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 7/3/2012 Approved per Kevin Condie.. Per Phone 6/21/13 - 1 year warranty - approved per Kevin C.
Wastewater 7/3/2012 Approved per Kevin Condie.. Per Phone 6/21/13 - 1 year warranty - approved per Kevin C.
Engineering 6/28/12 corrections required per Brandon W. Need warranty bond in place. 6/28/2012 Approved Streets Dept .. Per Ed Welch .. No drainage in street. 7/9/12 corrections required per Brandon W. Need warranty bond. 8/2/12 approved per Brandon W.
City Development Engineer 8/2/12 approved per Brandon W.
Landscaping 8/2/12 approved per Brandon W.
    
General Comments: