| Drawing of Record Submitted | 10/26/2012 |
|---|---|
| Electronic Drawing | 10/26/2012 |
| Final Grading Report | 10/26/2012 |
| Date Scheduled | 10/29/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 10/31/12 corrections requird per Kevin C. Break concrete around water lids. Valve extention. Open valve on fire system, on in planter. |
| Wastewater | 10/31/12 corrections requird per Kevin C. Break concrete around water lids. Valve extention. Open valve on fire system, on in planter. |
| Engineering | 10/29/2012 Approved per Brandon Wright |
| City Development Engineer | 10/29/2012 Approved per Wes Jenkins 10/30/2012 Approved per Randy Halverson STREET DEPT ONLY |
| Landscaping | 10/29/2012 Approved per Wes Jenkins |
| General Comments: | |