[Whisper Ridge Phase 4]
Number: Grading-43709

Drawing of Record Submitted 6/19/2012..revised 6-26-12
Electronic Drawing 6/19/2012..revised 6-26-12
Final Grading Report 6/19/2012
Date Scheduled 6/21/2012
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 6/27/12 approved per Dennis W. 9/09/2013 Approved Per Dennis Wright.. 1 year warranty
Water 6/22/12 corrections required per Kevin C. Concrete fire line valves. Meter boxes in driveways should be heavy boxes, if they brake it is developer/owner problem to fix. Need to check wire. Clean and paint hydrants. 6/29/2012 Approved per Kevin Condie..Phone Call 9/10/13 - 1 year warranty - approved per Kevin Condie.
Wastewater 6/22/12 corrections required per Kevin C. Concrete fire line valves. Meter boxes in driveways should be heavy boxes, if they brake it is developer/owner problem to fix. Need to check wire. Clean and paint hydrants. 6/29/2012 Approved per Kevin Condie..Phone Call 9/10/13 - 1 year warranty - approved per Kevin Condie.
Engineering 6/21/2012 Approved per Lonnie Sullivan 9/17/2013 Approved per Lonnie Sullivan.. 1 year Warranty
City Development Engineer 6/25/2012 Approved per Street Dept.. Per William Spencer
Landscaping
    
General Comments: