Drawing of Record Submitted |
6/19/2012..revised 6-26-12 |
Electronic Drawing |
6/19/2012..revised 6-26-12 |
Final Grading Report |
6/19/2012 |
Date Scheduled |
6/21/2012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
6/27/12 approved per Dennis W.
9/09/2013 Approved Per Dennis Wright.. 1 year warranty |
Water |
6/22/12 corrections required per Kevin C. Concrete fire line valves. Meter boxes in driveways should be heavy boxes, if they brake it is developer/owner problem to fix. Need to check wire. Clean and paint hydrants.
6/29/2012 Approved per Kevin Condie..Phone Call
9/10/13 - 1 year warranty - approved per Kevin Condie. |
Wastewater |
6/22/12 corrections required per Kevin C. Concrete fire line valves. Meter boxes in driveways should be heavy boxes, if they brake it is developer/owner problem to fix. Need to check wire. Clean and paint hydrants.
6/29/2012 Approved per Kevin Condie..Phone Call
9/10/13 - 1 year warranty - approved per Kevin Condie. |
Engineering |
6/21/2012 Approved per Lonnie Sullivan
9/17/2013 Approved per Lonnie Sullivan.. 1 year Warranty |
City Development Engineer |
6/25/2012 Approved per Street Dept.. Per William Spencer |
Landscaping |
|
| |
General Comments: |
|