| Drawing of Record Submitted | 6/19/2012..revised 6-26-12 |
|---|---|
| Electronic Drawing | 6/19/2012..revised 6-26-12 |
| Final Grading Report | 6/19/2012 |
| Date Scheduled | 6/21/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 6/27/12 approved per Dennis W. 9/09/2013 Approved Per Dennis Wright.. 1 year warranty |
| Water | 6/22/12 corrections required per Kevin C. Concrete fire line valves. Meter boxes in driveways should be heavy boxes, if they brake it is developer/owner problem to fix. Need to check wire. Clean and paint hydrants. 6/29/2012 Approved per Kevin Condie..Phone Call 9/10/13 - 1 year warranty - approved per Kevin Condie. |
| Wastewater | 6/22/12 corrections required per Kevin C. Concrete fire line valves. Meter boxes in driveways should be heavy boxes, if they brake it is developer/owner problem to fix. Need to check wire. Clean and paint hydrants. 6/29/2012 Approved per Kevin Condie..Phone Call 9/10/13 - 1 year warranty - approved per Kevin Condie. |
| Engineering | 6/21/2012 Approved per Lonnie Sullivan 9/17/2013 Approved per Lonnie Sullivan.. 1 year Warranty |
| City Development Engineer | 6/25/2012 Approved per Street Dept.. Per William Spencer |
| Landscaping | |
| General Comments: | |