| Drawing of Record Submitted | 8/20/2012 |
|---|---|
| Electronic Drawing | 8/20/2012 |
| Final Grading Report | 8/20/2012 |
| Date Scheduled | 8/09/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 8/13/12 not ready for final utility inspection per Kevin C. 8/17/2012 Approved per Kevin Condie 6/21/13 - 1 year warranty - approved per Kevin C. |
| Wastewater | 8/13/12 not ready for final utility inspection per Kevin C. 8/17/2012 Approved per Kevin Condie 6/21/13 - 1 year warranty - approved per Kevin C. |
| Engineering | 8/9/12 corrections required per Brandon W. Grout DI box on 2420 East. Pad grades and prop corners front and rear. Bonds needed for final. 8/16/2012 Approved Per Brandon Wright 10/25/13 - 1 year warranty Phase 2- approved per Wes Jenkins. |
| City Development Engineer | 8/13/2012 Streets Dept per Randy H. Corrections required..Cut off pipe in box on Southeast corner, Install steps & grout , the box to the West 8/16/2012 Approved per West Jenkins.. Need Bond before Final Plat can be recorded 9/14/2012 Approved Per Wes Jenkins.. Meadow Valley Phase 3 Only 10/25/13 - 1 year warranty Phase 2 - approved per Wes Jenkins. |
| Landscaping | 8/16/2012 Approved per West Jenkins 9/14/2012 Approved per Wes Jenkions.. Meadow Valley Phase 3 Only 10/25/13 - 1 year warranty Phase 2- approved per Wes Jenkins. |
| General Comments: | |