| Drawing of Record Submitted | 11/03/2012 |
|---|---|
| Electronic Drawing | 11/03/2012 |
| Final Grading Report | 11/032012 |
| Date Scheduled | 11/042012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 10/04/2012 Approved per Kevin Condie |
| Wastewater | 10/04/2012 Approved per Kevin Condie |
| Engineering | Approved 10/04/2012 Approved per Lonnie S Note:Approved By Brandon Wright.. He met with Quality on 10-1 and went over the project with Todd Call. before this Final came out I Lonnie called Brandon W this morning at 9:00am to find out if he was ok with me signing off on this. He was talked with Wes about signing off on the as well. 8/05/2013 1 yr warranty Corrections required Per Brandon Wright..1 year warranty.. Eng.. Water standing in two locations,Lagrasse Circle & 2440 East South est side, Lagrasse Drive & 2350 East next to cross south Hac 8/3/2015 1 yr warranty Corrections required: Seal cuts on Crimson Ridge Drive |
| City Development Engineer | 10/5/12 STREETS ONLY - corrections required per Viliami Koloa - change storm drain lids to irrigation lids. 10/12/2012 Approved per Wes Jenkins |
| Landscaping | 10/12/2012 Approved Per Wes Jenkins |
| General Comments: | |