Drawing of Record Submitted |
11/03/2012 |
Electronic Drawing |
11/03/2012 |
Final Grading Report |
11/032012 |
Date Scheduled |
11/042012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/04/2012 Approved per Kevin Condie |
Wastewater |
10/04/2012 Approved per Kevin Condie |
Engineering |
Approved 10/04/2012 Approved per Lonnie S
Note:Approved By Brandon Wright.. He met with Quality on 10-1 and went over
the project with Todd Call. before this Final came out I Lonnie called Brandon W this morning at 9:00am to find out if he was ok with me signing off on this. He was talked with Wes about signing off on the as well.
8/05/2013 1 yr warranty Corrections required Per Brandon Wright..1 year warranty.. Eng.. Water standing in two locations,Lagrasse Circle & 2440 East South est side, Lagrasse Drive & 2350 East next to cross south Hac
8/3/2015 1 yr warranty Corrections required: Seal cuts on Crimson Ridge Drive |
City Development Engineer |
10/5/12 STREETS ONLY - corrections required per Viliami Koloa - change storm drain lids to irrigation lids.
10/12/2012 Approved per Wes Jenkins |
Landscaping |
10/12/2012 Approved Per Wes Jenkins |
| |
General Comments: |
|