| Drawing of Record Submitted | 4/15/2013 |
|---|---|
| Electronic Drawing | 4/15/2013 |
| Final Grading Report | 4/15/2013 |
| Date Scheduled | 4/17/2013 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | Corrections required per Kevin Condie..For Conlan.. Test all back flows, one in building & landscaping have been tested but one in pump station need to be tested , will help with anything they need. Need to abandon meter & setter by hydrant at entrance 4/22/2013 Appproved per Kevin Condie 3/31/2014 Approved per Kevin Condie.. 1 yr warranty |
| Wastewater | Corrections required per Kevin Condie..For Conlan.. Test all back flows, one in building & landscaping have been tested but one in pump station need to be tested , will help with anything they need. Need to abandon meter & setter by hydrant at entrance 4/22/2013 Appproved per Kevin Condie 3/31/2014 Approved per Kevin Condie.. 1 yr warranty |
| Engineering | 4/18/13 approved per Brandon Wright. 3/18/2014 Approved per Brandon Wright.. 1 Year Waranty |
| City Development Engineer | 4/18/13 approved per Brandon Wright. |
| Landscaping | 4/16/2013 Corrections required per Craig Harvey..Landscape as shown on Sheet 11.1 A & B has not been completed 5/14/2013 Approved per Craig Harvey 3/10/2014 Corrections required per Craig Harvey.. 1 Year Warranty.. Large number of shrubs are dead, several mondal pines are dead, landscpae mulch (rock mulch) has washed away,several street trees appear to be dead on River Road |
| General Comments: | |