| Drawing of Record Submitted | 12/14/2012 |
|---|---|
| Electronic Drawing | 12/14/2012 |
| Final Grading Report | 12/14/2012 |
| Date Scheduled | 12/17/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 12/21/12 corrections required per Kevin C. remove concrete out of meter boxes. Clean and paint hydrants. Hydrant not plumbed - fix. Need to check wire. 12/27/12 approved per Kevin C. 12/09/2013 Approved per Kevin Condie.. 1 year warranty |
| Wastewater | 12/21/12 corrections required per Kevin C. remove concrete out of meter boxes. Clean and paint hydrants. Hydrant not plumbed - fix. Need to check wire. 12/27/12 approved per Kevin C. 12/09/2013 Approved per Kevin Condie.. 1 year warranty |
| Engineering | 12/17/12 corrections required per Brandon W. Need bons in place for final. 12/26/2012 Approved per Brandon Wright 11/06/2013 Approved per Brandon Wright.. 1 year warranty |
| City Development Engineer | 12/17/2012 Approved per Streets Det Only..Per Vil Koloa 12/26/2012 Approved per Wes Jenkins |
| Landscaping | 12/26/2012 Approved per Wes Jenkins |
| General Comments: | |