Drawing of Record Submitted |
12/14/2012 |
Electronic Drawing |
12/14/2012 |
Final Grading Report |
12/14/2012 |
Date Scheduled |
12/17/2012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
12/21/12 corrections required per Kevin C. remove concrete out of meter boxes. Clean and paint hydrants. Hydrant not plumbed - fix. Need to check wire.
12/27/12 approved per Kevin C.
12/09/2013 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
12/21/12 corrections required per Kevin C. remove concrete out of meter boxes. Clean and paint hydrants. Hydrant not plumbed - fix. Need to check wire.
12/27/12 approved per Kevin C.
12/09/2013 Approved per Kevin Condie.. 1 year warranty |
Engineering |
12/17/12 corrections required per Brandon W. Need bons in place for final.
12/26/2012 Approved per Brandon Wright
11/06/2013 Approved per Brandon Wright.. 1 year warranty |
City Development Engineer |
12/17/2012 Approved per Streets Det Only..Per Vil Koloa
12/26/2012 Approved per Wes Jenkins |
Landscaping |
12/26/2012 Approved per Wes Jenkins |
| |
General Comments: |
|