Drawing of Record Submitted |
1/28/2013 |
Electronic Drawing |
1/28/013 |
Final Grading Report |
1/24/2013 |
Date Scheduled |
1/31/2013 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
1/31/2013 Approved per Dennis Wright
1/9/13 - 1 year warranty - approved per Dennis Wright. |
Water |
2/1/13 corrections required per Carson Tait. Need a concrete pad poured around the meter box. Need the backflow assemblies tested and tagged. (2) one outside and the assembly on the fireline riser.
2/20/13 approved per Carson T.
1/10/2014 Approved per Carson Tait.. 1 year warranty |
Wastewater |
2/1/13 corrections required per Carson Tait. Need a concrete pad poured around the meter box. Need the backflow assemblies tested and tagged. (2) one outside and the assembly on the fireline riser.
2/20/13 approved per Carson T.
1/10/2014 Approved per Carson Tait.. 1 year warranty |
Engineering |
1/31/13 corrections required per Brandon W. Asphalt will not drain properly to East side of lot. Striping is not complete.
2/19/13 approved per Brandon W.
1/14/2014 Approved per Brandon Wright.. 1 year warranty |
City Development Engineer |
1/31/13 STREETS - approved per Randy Halverson.
2/1/13 corrections required per Wes Jenkins. Asphalt needs to be addressed.
2/19/13 approved per Brandon W. |
Landscaping |
2/1/13 approved per Craig H. |
| |
General Comments: |
|