| Drawing of Record Submitted | 05/04/2005-05/24/2005 |
|---|---|
| Electronic Drawing | |
| Final Grading Report | 05/04/205 |
| Date Scheduled | 05/10/2005 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 05/11/2005 Approved per Dennis Wright Phase 1 only 8/3/07 - 1 year warranty - approved per Dennis Wright. |
| Water | 05/11/2005 Corrections required Per Allen Briggs..Raise and concrete valve on West side of valve and tier assembly one hydrant .. complete project as per plan 05/19/2005 Corrections required per Allen Briggs.. Raise valve can and concrete on TEE at end of asphalt. 08/29/2006 Approved per Kevin Condie.. Phase 1 only 8/8/07 1 year warranty - corrections required per Darrin Judd. Fire hydrant on lot 39 needs to be lowered - too high. |
| Wastewater | 05/11/2005 Corrections required Per Allen Briggs..Raise and concrete valve on West side of valve and tier assembly one hydrant .. complete project as per plan 05/19/2005 Corrections required per Allen Briggs.. Raise valve can and concrete on TEE at end of asphalt. 08/29/2006 Approved per Kevin Condie.. Phase 1 only 8/8/07 1 year warranty - corrections required per Darrin Judd. Fire hydrant on lot 39 needs to be lowered - too high. |
| Engineering | 05/20/2005 Approved per Larry Henderson Phase 1 only 8/7/07 - 1 year warranty - approved per Brandon W. |
| City Development Engineer | 05/19/2005 Corrections required per Cathy H.. Electronic DWG of record. Hillisde compliance letter. Private improvement certificate -- revised 05/25/2005 Approved per Cathy H.. Electronic DWG of Records.Phase 1 only 8/6/07 - 1 year warranty - NA - private streets - per Cathy H. |
| Landscaping | 05/12/2005 Corrections required per Mark Bradley.. Need to stripe parking lot 08/29/2006 Approved per Ken B... Striping in parking.Phase 1 only 8/6/07 - 1 year warranty - NA - private streets - per Cathy H. |
| General Comments: | |
| Cut/Fill along property lines needs to be observed closly especially along the South line where plans are not detailed. In particular walls should not be undermined by excavation. | |