| Drawing of Record Submitted | 1/04/2013...1/7/2013 |
|---|---|
| Electronic Drawing | 1/04/2013..1/072013 |
| Final Grading Report | 1/04/2013 |
| Date Scheduled | 1/07/2013 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 1/07/2013 Approved Dennis Wright 11/4/13 - 1 year warranty approved per Dennis W. |
| Water | 1/8/13 corrections required per Carson Taite. Need valve operating extensions on the two valves closest to the main entrance. Need to correct the locate wire in the center of the alve can or provide alternative tracing route. need to pour a concrete collar around the fire hydrant in the planter. 1/09/2013 Approved per Carson Tait 11/08/2013 A[proved per Darrin Judd.. 1 year warranty |
| Wastewater | 1/8/13 corrections required per Carson Taite. Need valve operating extensions on the two valves closest to the main entrance. Need to correct the locate wire in the center of the alve can or provide alternative tracing route. need to pour a concrete collar around the fire hydrant in the planter. 1/09/2013 Approved per Carson Tait 11/08/2013 A[proved per Darrin Judd.. 1 year warranty |
| Engineering | 1/07/2013 Approved per Brandon Wright 11/05/2013 Approved per brandon Wright.. 1 year Warranty |
| City Development Engineer | 1/08/2012 STREETS DEPT ONLY..Per Howard Young 1/09/2013 Approved per Wes Jenkins |
| Landscaping | 1/09/2013 Approved per Wes Jenkins |
| General Comments: | |