| Drawing of Record Submitted | 1/22/2013 |
|---|---|
| Electronic Drawing | 1/22/2013 |
| Final Grading Report | 1/22/2013 |
| Date Scheduled | 1/24/2013 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 1/25/13 corrections required per Kevin C. Paint and clean hydrants. Wire okay. Open all valves. 1/29/2013 Approved Per Kevin Condie 12/06/2013 Approved per Kevin Condie/.. 1 yesr Warranty |
| Wastewater | 1/25/13 corrections required per Kevin C. Paint and clean hydrants. Wire okay. Open all valves. 1/29/2013 Approved Per Kevin Condie 12/06/2013 Approved per Kevin Condie/.. 1 yesr Warranty |
| Engineering | 1/24/2013 Corrections Required Per Brandon Wright.. Bonds Not in Place 1/30/2013 Approved Per Brandon Wright 11/06/2013 Approved per Brandon Wright.. 1 year warranty |
| City Development Engineer | 1/25/2013 Approved STREETS ONLY: per Vill Koloa 1/29/13 approved per Wes Jenkins. |
| Landscaping | 1/29/13 approved per Wes Jenkins. |
| General Comments: | |