Drawing of Record Submitted |
9/04/2013 |
Electronic Drawing |
9/04/2013 |
Final Grading Report |
9/05/2013 |
Date Scheduled |
9/09/2013 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
9/09/2013 Approved per Dennis Wright
10/6/14 1 year warranty approved per Dennis Wright |
Water |
9/9/2013 Corrections Required Per Carson tait.. NOT READY
11/06/2013 Approved per Carson Tait
10/15/2014 Approved per Carson Tait.. 1 Year Warranty |
Wastewater |
9/9/2013 Corrections Required Per Carson tait.. NOT READY
11/06/2013 Approved per Carson Tait
10/15/2014 Approved per Carson Tait.. 1 Year Warranty |
Engineering |
9/10/2013 Approved per Lonnie Sullivan.. A few minor items to finish outside
10/17/2014 Approved per Brandon Wright.. 1 yr warranty |
City Development Engineer |
9/09/2013 Approved STREETS DEPT ONLY.. Per Jared Stewart |
Landscaping |
9/23/2013 corrections required per Craig Harvey.. Contractor needs to provide City with new plan of the landscape. Plan approved does not match existing on site. Street trees are required on 400 East and are missing as shown on required plan. |
| |
General Comments: |
|