| Drawing of Record Submitted | 11/12/2013 |
|---|---|
| Electronic Drawing | 11/12/2013 |
| Final Grading Report | 11/12/2013 |
| Date Scheduled | 11/14/2013 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 11/18/13 corrections required per Kevin C. Paint Hydrants, remove collar around hydrant on North and re-do. Arrow and line size in collars. 11/27/2013 Approved Per Kevin Condie 1/12/2015 Approved per Kevin Condie 1 yr warranty |
| Wastewater | 11/18/13 corrections required per Kevin C. Paint Hydrants, remove collar around hydrant on North and re-do. Arrow and line size in collars. 11/27/2013 Approved Per Kevin Condie 1/12/2015 Approved per Kevin Condie 1 yr warranty |
| Engineering | 11/14/13 corrections required per Brandon W. Site is not complete missing Landscape. Striping and signage. Broken Walk. Cleanup. 11/25/2013 Approved per Brandon Wright 1/02/2015 Approved per Brandon Wright 1 yr warranty |
| City Development Engineer | 11/18/13 corrections required per Jared Stewart (for STREETS)- Southeast curb inlet needs forms taken out of inlet box. Northeast catch basins outlet pipe connects to a smaller size pipe - 12" pvc to 8" pvc. 12/02/2013 Approved per Wes Jenkins 12/04/2013 Approved per Jared Stewart STREETS DEPT |
| Landscaping | 11/25/2013 Approved per Brandon Wright |
| General Comments: | |