| Drawing of Record Submitted | 9/27/2013 |
|---|---|
| Electronic Drawing | 9/27/2013 |
| Final Grading Report | 9/27/2013 |
| Date Scheduled | 10/01/2013 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 10/02/2013 RIVERSTONE PHASE 1 - Approved per Kevin Condie 9/15/14 - LAS COLINAS phase 4 - approved per Kevin Condie 1/27/20115 Corrections required per Kevin Condie 1 year warranty water trenches are settling need to be fixed 8/5/15 approved per Kevin Condie |
| Wastewater | 10/02/2013 RIVERSTONE PHASE 1 - Approved per Kevin Condie 9/15/14 - LAS COLINAS phase 4 - approved per Kevin Condie 1/27/20115 Corrections required per Kevin Condie 1 year warranty water trenches are settling need to be fixed 8/5/15 approved per Kevin Condie |
| Engineering | 10/01/2013 RIVERSTONE PHASE 1 - Approved per Lonnie Sullivan 9/15/14 - LAS COLINAS phase 4 - approved per Brandon Wright 1/27/2015 Corrections required Roads are failing 8/14/2015 1 yr Warranty Approved per Brandon Wright |
| City Development Engineer | 10/02/2013 RIVERSTONE PHASE 1 - Approved per Street Dept Only.. Per Jared Stewart 10/11/2013 RIVERSTONE PHASE 1 - Approved per Wes Jenkins 9/18/14 - STREETS LAS COLINAS PHASE 4 - approved per Jay Smith - storm drain is good. |
| Landscaping | 10/11/2013 RIVERSTONE PHASE 1 - Approved per Wes Jenkins 9/18/14 LAS COLINAS PHASE $ - approved per Mark Goble. |
| General Comments: | |