[Las Colina Phase 4 & Riverstone]
Number: Grading-44891

Drawing of Record Submitted 9/27/2013
Electronic Drawing 9/27/2013
Final Grading Report 9/27/2013
Date Scheduled 10/01/2013
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 10/02/2013 RIVERSTONE PHASE 1 - Approved per Kevin Condie 9/15/14 - LAS COLINAS phase 4 - approved per Kevin Condie 1/27/20115 Corrections required per Kevin Condie 1 year warranty water trenches are settling need to be fixed 8/5/15 approved per Kevin Condie
Wastewater 10/02/2013 RIVERSTONE PHASE 1 - Approved per Kevin Condie 9/15/14 - LAS COLINAS phase 4 - approved per Kevin Condie 1/27/20115 Corrections required per Kevin Condie 1 year warranty water trenches are settling need to be fixed 8/5/15 approved per Kevin Condie
Engineering 10/01/2013 RIVERSTONE PHASE 1 - Approved per Lonnie Sullivan 9/15/14 - LAS COLINAS phase 4 - approved per Brandon Wright 1/27/2015 Corrections required Roads are failing 8/14/2015 1 yr Warranty Approved per Brandon Wright
City Development Engineer 10/02/2013 RIVERSTONE PHASE 1 - Approved per Street Dept Only.. Per Jared Stewart 10/11/2013 RIVERSTONE PHASE 1 - Approved per Wes Jenkins 9/18/14 - STREETS LAS COLINAS PHASE 4 - approved per Jay Smith - storm drain is good.
Landscaping 10/11/2013 RIVERSTONE PHASE 1 - Approved per Wes Jenkins 9/18/14 LAS COLINAS PHASE $ - approved per Mark Goble.
    
General Comments: