| Drawing of Record Submitted | 5/23/2013 |
|---|---|
| Electronic Drawing | 5/23/2013 |
| Final Grading Report | 5/23/2013 |
| Date Scheduled | 5/29/2013 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 5/30/13 corrections required per Kevin C. Clean hydrants and paint. Move hydrant 1' behind sidewalk. 5/30/2013 Approved per Kevin Condie 4/10/14 - 1 year warranty approved per Kevin Condie |
| Wastewater | 5/30/13 corrections required per Kevin C. Clean hydrants and paint. Move hydrant 1' behind sidewalk. 5/30/2013 Approved per Kevin Condie 4/10/14 - 1 year warranty approved per Kevin Condie |
| Engineering | 5/30/13 approved per Brandon Wright. 4/17/14 - 1 year warranty approved per Brandon Wright |
| City Development Engineer | 5/30/2013 Approved Per Wes Jenkins.. 5/31/2013 Approved per Streets dept.. Jared Stewart |
| Landscaping | 5/30/13 approved per Brandon Wright. Landscaping strip approed per Mark Goble 5/30 LIttle Valley raod |
| General Comments: | |