[Village @ Little Valley Phase 2]
Number: Grading-44899

Drawing of Record Submitted 5/23/2013
Electronic Drawing 5/23/2013
Final Grading Report 5/23/2013
Date Scheduled 5/29/2013
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/30/13 corrections required per Kevin C. Clean hydrants and paint. Move hydrant 1' behind sidewalk. 5/30/2013 Approved per Kevin Condie 4/10/14 - 1 year warranty approved per Kevin Condie
Wastewater 5/30/13 corrections required per Kevin C. Clean hydrants and paint. Move hydrant 1' behind sidewalk. 5/30/2013 Approved per Kevin Condie 4/10/14 - 1 year warranty approved per Kevin Condie
Engineering 5/30/13 approved per Brandon Wright. 4/17/14 - 1 year warranty approved per Brandon Wright
City Development Engineer 5/30/2013 Approved Per Wes Jenkins.. 5/31/2013 Approved per Streets dept.. Jared Stewart
Landscaping 5/30/13 approved per Brandon Wright. Landscaping strip approed per Mark Goble 5/30 LIttle Valley raod
    
General Comments: