| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | DREA |
| Water | 01/10/2003. Per Carson.Need to lower two meter stetters.the city spec is 6-9" from top lip of box to top of the water meter.These are less than 1".Lower them and call for a areinspection.Our water meters freeze and break if they are set this high. 01/23/2003 Approved per Carson Tait |
| Wastewater | 01/10/2003. Per Carson.Need to lower two meter stetters.the city spec is 6-9" from top lip of box to top of the water meter.These are less than 1".Lower them and call for a areinspection.Our water meters freeze and break if they are set this high. 01/23/2003 Approved per Carson Tait |
| Engineering | |
| City Development Engineer | 01/06/2003 OK per Judd |
| Landscaping | N/A |
| General Comments: | |
| 04/21/2003 Received detention basin letter from L. R. Pope Engineering to Jay Sandberg/Judd Burgess. | |