Drawing of Record Submitted |
5/01/2014 |
Electronic Drawing |
5/01/2014 |
Final Grading Report |
5/01/2014 |
Date Scheduled |
5/02/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/05/2014 Apprpoved per Dennis Wright |
Water |
5/06/2014 Corrections required per Carson Tait..Need backflow assembly on the Fire Riser tested and tagged. Need the valve can riser replaced in the street and locate wires repaired It was installed wrong and the lid has cut the wires
5/14/2014 Approved per Carson Tait |
Wastewater |
5/06/2014 Corrections required per Carson Tait..Need backflow assembly on the Fire Riser tested and tagged. Need the valve can riser replaced in the street and locate wires repaired It was installed wrong and the lid has cut the wires
5/14/2014 Approved per Carson Tait |
Engineering |
5/05/2014 Approved per Brandon Wright |
City Development Engineer |
5/02/2014 Approved per Streets Dept Only Jared Stewart
6/05/2014 Approved per Wes Jenkins |
Landscaping |
5/05/2014 Approved per Craig Harvey |
| |
General Comments: |
|