[Shadowhawk Townhomes]
Number: Grading-45259

Drawing of Record Submitted 3/06/2014
Electronic Drawing 3/06/2014
Final Grading Report 3/062/014
Date Scheduled 3/10/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 3/12/2014 Approved per Dennis Wright 07/08/2015 Approved per Bryce Mitchell 1 year warranty
Water 3/10/2014 Corrections required Per Carson Tait..Need to pour concrete meter pads and fire hydrant pad. Need to mark the concrete @ th meter pads with the apt unit number. Need to have the back flow assembly tested and tagged Need back flow preventers on hose bibs 04/04/2014 Corrections required per Carson Tait.. Can't FINAL th eproject unitl all of the meter box pads and Fire Hydrant pads are poured ..NEED an as- built drawing 4/16/2014 Approved per Kevin Condie 7/01/2015 Approved per Carson Tait 1 yr warranty
Wastewater 3/10/2014 Corrections required Per Carson Tait..Need to pour concrete meter pads and fire hydrant pad. Need to mark the concrete @ th meter pads with the apt unit number. Need to have the back flow assembly tested and tagged Need back flow preventers on hose bibs 04/04/2014 Corrections required per Carson Tait.. Can't FINAL th eproject unitl all of the meter box pads and Fire Hydrant pads are poured ..NEED an as- built drawing 4/16/2014 Approved per Kevin Condie 7/01/2015 Approved per Carson Tait 1 yr warranty
Engineering 3/12/14 approved per Brandon W. 7/15/2015 Approved per Brandon Wright 1 yr warranty
City Development Engineer 3/10/2014 Approved per Jared Stweart.. Streets Dept ONLY 3/17/2014 Approved per Wes Jenkins
Landscaping 3/10/2014 Approved per Craig Harvey.. ONLY units 1 thru 10
    
General Comments: