Drawing of Record Submitted |
3/06/2014 |
Electronic Drawing |
3/06/2014 |
Final Grading Report |
3/062/014 |
Date Scheduled |
3/10/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
3/12/2014 Approved per Dennis Wright
07/08/2015 Approved per Bryce Mitchell 1 year warranty |
Water |
3/10/2014 Corrections required Per Carson Tait..Need to pour concrete meter pads and fire hydrant pad. Need to mark the concrete @ th meter pads with the apt unit number. Need to have the back flow assembly tested and tagged Need back flow preventers on hose bibs
04/04/2014 Corrections required per Carson Tait.. Can't FINAL th eproject unitl all of the meter box pads and Fire Hydrant pads are poured ..NEED an as- built drawing
4/16/2014 Approved per Kevin Condie
7/01/2015 Approved per Carson Tait 1 yr warranty |
Wastewater |
3/10/2014 Corrections required Per Carson Tait..Need to pour concrete meter pads and fire hydrant pad. Need to mark the concrete @ th meter pads with the apt unit number. Need to have the back flow assembly tested and tagged Need back flow preventers on hose bibs
04/04/2014 Corrections required per Carson Tait.. Can't FINAL th eproject unitl all of the meter box pads and Fire Hydrant pads are poured ..NEED an as- built drawing
4/16/2014 Approved per Kevin Condie
7/01/2015 Approved per Carson Tait 1 yr warranty |
Engineering |
3/12/14 approved per Brandon W.
7/15/2015 Approved per Brandon Wright 1 yr warranty |
City Development Engineer |
3/10/2014 Approved per Jared Stweart.. Streets Dept ONLY
3/17/2014 Approved per Wes Jenkins |
Landscaping |
3/10/2014 Approved per Craig Harvey.. ONLY units 1 thru 10 |
| |
General Comments: |
|