| Drawing of Record Submitted | 10/25/2013 |
|---|---|
| Electronic Drawing | 10/25/2013 |
| Final Grading Report | 10/25/2013 |
| Date Scheduled | 10/29/2013 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 10/29/2013 corrections required per Kevin C. Turn hydrant. Paint hydrants. Open all valves. Hydrant too low, need to be raised. W on curbs. 11/4/13 approved per Kevin C. 11/05/2014 Approved per Kevin Condie 1 yr warranty |
| Wastewater | 10/29/2013 corrections required per Kevin C. Turn hydrant. Paint hydrants. Open all valves. Hydrant too low, need to be raised. W on curbs. 11/4/13 approved per Kevin C. 11/05/2014 Approved per Kevin Condie 1 yr warranty |
| Engineering | 10/31/13 corrections required per Brandon W. Missing rear prop corners West side of sub. Soft spot in asphalt on stub road. Lots not backfilled along wall. 11/4/13 approved per Brandon W. 10/10/14 - 1 year warranty - approved per Brandon W. |
| City Development Engineer | 10/30/2013 Approved per Jared Stewart.. STREETS DEPT ONLY 11/07/2013 Approved Wes Jenkins 11/07/2014 Approved per Wes Jenkins 1 yr warranty |
| Landscaping | 11/07/2013 Approved per Wes Jenkins |
| General Comments: | |
| Note: Need Equestrian Dr - Storm Drain and testing info on Final Grading | |