Drawing of Record Submitted |
10/25/2013 |
Electronic Drawing |
10/25/2013 |
Final Grading Report |
10/25/2013 |
Date Scheduled |
10/29/2013 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/29/2013 corrections required per Kevin C. Turn hydrant. Paint hydrants. Open all valves. Hydrant too low, need to be raised. W on curbs. 11/4/13 approved per Kevin C.
11/05/2014 Approved per Kevin Condie 1 yr warranty |
Wastewater |
10/29/2013 corrections required per Kevin C. Turn hydrant. Paint hydrants. Open all valves. Hydrant too low, need to be raised. W on curbs. 11/4/13 approved per Kevin C.
11/05/2014 Approved per Kevin Condie 1 yr warranty |
Engineering |
10/31/13 corrections required per Brandon W. Missing rear prop corners West side of sub. Soft spot in asphalt on stub road. Lots not backfilled along wall.
11/4/13 approved per Brandon W.
10/10/14 - 1 year warranty - approved per Brandon W. |
City Development Engineer |
10/30/2013 Approved per Jared Stewart.. STREETS DEPT ONLY
11/07/2013 Approved Wes Jenkins
11/07/2014 Approved per Wes Jenkins 1 yr warranty |
Landscaping |
11/07/2013 Approved per Wes Jenkins |
| |
General Comments: |
Note: Need Equestrian Dr - Storm Drain and testing info on Final Grading |