Drawing of Record Submitted |
6/30/2014-7/16/2014 |
Electronic Drawing |
6/30/2014-7/16/2014 |
Final Grading Report |
6/30/2014-7/16/2014 |
Date Scheduled |
7/03/2014-7/17/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
7/01/2014 Corrections required per Kevin Condie.. Phase 1 ok Need to Final Desert Canyon Drive First
7/18/2014 Approved per Kevin Condie
7/08/2015 Approved per Kevin Condie 1 year warranty |
Wastewater |
7/01/2014 Corrections required per Kevin Condie.. Phase 1 ok Need to Final Desert Canyon Drive First
7/18/2014 Approved per Kevin Condie
7/08/2015 Approved per Kevin Condie 1 year warranty |
Engineering |
7/03/2014 Corrections Required Per Brandon Wright.. Not ready for Final
7/18/2014 Approved per Brandon Wright..NOTE: Concrete Islands need to be poured at roundabout before 1 year warrant, Note: Wes Jenkins is working Rockwall problems out with Quality
5/22/2015 Approved per Brandon Wright 1 year warranty
|
City Development Engineer |
4/08/2014 Approved per Jared Stewart STREETS DEPT Only.. Signs ok |
Landscaping |
7/2/14 Corrections required per Craig Harvey. Install landscaping as shown on plan or bond for the improvements.
8/06/2015 Approved per Craig Harvey Parks Dept Per Craig Harvey.. 1 year warranty
Note:
For Deserts Edge Drive Trail |
| |
General Comments: |
|