| Drawing of Record Submitted | 2/13/2014 |
|---|---|
| Electronic Drawing | 2/13/2014 |
| Final Grading Report | 2/13/2014 |
| Date Scheduled | 2/18/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 2/24/2014 Approved per Kevin Condie 1/27/2015 Approved per Kevin Condie 1 year warranty Phase 3 & 4 |
| Wastewater | 2/24/2014 Approved per Kevin Condie 1/27/2015 Approved per Kevin Condie 1 year warranty Phase 3 & 4 |
| Engineering | 2/20/2014 Approved per Brandon Wright 1/27/2015 Approved per Brandon Wright 1 year warranty Phase 3 & Phase 4 |
| City Development Engineer | 2/19/2014 Corrections required ....STREETS DEPT ONLY.. Per Jared Stewart. Both manhole lids need to be storm drain not sanitory sewer lids. Switch to storm drain lids, Trim pipes in boxes 3 & 4 of storm drain system 2/20/2014 Approved per Jared Stewarr STREETS DEPT ONLY 1/29/2015 Approved per Brandon Wright 1 yr warranty |
| Landscaping | 1/29/2015 Approved per Brandon Wright 1 year warranty |
| General Comments: | |
| Mass Grading Only | |