Sycamore Estates Phase 3 thru 8
Number: Grading-45532

Drawing of Record Submitted 2/13/2014
Electronic Drawing 2/13/2014
Final Grading Report 2/13/2014
Date Scheduled 2/18/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 2/24/2014 Approved per Kevin Condie 1/27/2015 Approved per Kevin Condie 1 year warranty Phase 3 & 4
Wastewater 2/24/2014 Approved per Kevin Condie 1/27/2015 Approved per Kevin Condie 1 year warranty Phase 3 & 4
Engineering 2/20/2014 Approved per Brandon Wright 1/27/2015 Approved per Brandon Wright 1 year warranty Phase 3 & Phase 4
City Development Engineer 2/19/2014 Corrections required ....STREETS DEPT ONLY.. Per Jared Stewart. Both manhole lids need to be storm drain not sanitory sewer lids. Switch to storm drain lids, Trim pipes in boxes 3 & 4 of storm drain system 2/20/2014 Approved per Jared Stewarr STREETS DEPT ONLY 1/29/2015 Approved per Brandon Wright 1 yr warranty
Landscaping 1/29/2015 Approved per Brandon Wright 1 year warranty
    
General Comments:
Mass Grading Only