Drawing of Record Submitted |
2/13/2014 |
Electronic Drawing |
2/13/2014 |
Final Grading Report |
2/13/2014 |
Date Scheduled |
2/18/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
2/24/2014 Approved per Kevin Condie
1/27/2015 Approved per Kevin Condie 1 year warranty Phase 3 & 4 |
Wastewater |
2/24/2014 Approved per Kevin Condie
1/27/2015 Approved per Kevin Condie 1 year warranty Phase 3 & 4 |
Engineering |
2/20/2014 Approved per Brandon Wright
1/27/2015 Approved per Brandon Wright 1 year warranty Phase 3 & Phase 4 |
City Development Engineer |
2/19/2014 Corrections required ....STREETS DEPT ONLY.. Per Jared Stewart. Both manhole lids need to be storm drain not sanitory sewer lids. Switch to storm drain lids, Trim pipes in boxes 3 & 4 of storm drain system
2/20/2014 Approved per Jared Stewarr STREETS DEPT ONLY
1/29/2015 Approved per Brandon Wright 1 yr warranty |
Landscaping |
1/29/2015 Approved per Brandon Wright 1 year warranty |
| |
General Comments: |
Mass Grading Only |