[Flats @ South Point Phase 3]
Number: Grading-45558

Drawing of Record Submitted 2/04/2014
Electronic Drawing 02/04/2014 03/18/2014
Final Grading Report 2/05/2014 03/18/2014
Date Scheduled 2/06/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 3/12/2014 Approved per Dennis Wright
Water 2/10/14 corrections required per Carson Taite. The fire hydrant on the West side needs a hydrant pad. Need to complete the project. Need meter box and hydrant pads poured. 5/19/14 approved per Carson Taite. Project okay. Need to hold all COS in this project until meter box pads that are broken get replaced.
Wastewater 2/10/14 corrections required per Carson Taite. The fire hydrant on the West side needs a hydrant pad. Need to complete the project. Need meter box and hydrant pads poured. 5/19/14 approved per Carson Taite. Project okay. Need to hold all COS in this project until meter box pads that are broken get replaced.
Engineering 2/07/2014 Corrections required per Brandon Wright.. Bonds are not in place with City Notice of termination not filed with State 3/20/2014 Approved per Brandon Wright
City Development Engineer 2/07/2014 STREETS DEPT.. Corrections required per Jared Stewart..Need 3 end of road markers at end of 450 North, need an object marker on end of Jersey barricade on 2720 East. Storm drain is all good. Stop sign needed on "Private Drive A" coming on 450 North 3/20/2014 Corrections required pre Jared Stewart.. Streets Dept. Stop Sign needed on Private Drive "A" coming onto 450 North 5/19/2014 Approved per Streets Dept Only.. Per John Graves 5/20/2014 Approved per Wes Jenkins
Landscaping 5/20/2014 Approved per Wes Jenkins
    
General Comments: