[Meadow Park Phase 2]
Number: Grading-45725

Drawing of Record Submitted 2/26/2014
Electronic Drawing 2/26/2014
Final Grading Report 2/26/2014
Date Scheduled 3/03/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 3/04/2014 Approved per Kevin Condie..Remove tape on hydrants paint to top of concrete Check all valve open punch list is done 1/27/2015 Approved per Kevin Condie 1 year warranty
Wastewater 3/04/2014 Approved per Kevin Condie..Remove tape on hydrants paint to top of concrete Check all valve open punch list is done 1/27/2015 Approved per Kevin Condie 1 year warranty
Engineering 3/04/2014 Approved Brandon Wright 1/29/2015 Approved per Brandon Wright 1 year warranty
City Development Engineer 03/05/2014 STREETS DEPT ONLY.. Per Jared Stewart 3/07/2014 Approved per Wes Jenkins
Landscaping 3/07/2014 Approved Per Wes Jenkins
    
General Comments: