| Drawing of Record Submitted | 2/26/2014 |
|---|---|
| Electronic Drawing | 2/26/2014 |
| Final Grading Report | 2/26/2014 |
| Date Scheduled | 3/03/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 3/04/2014 Approved per Kevin Condie..Remove tape on hydrants paint to top of concrete Check all valve open punch list is done 1/27/2015 Approved per Kevin Condie 1 year warranty |
| Wastewater | 3/04/2014 Approved per Kevin Condie..Remove tape on hydrants paint to top of concrete Check all valve open punch list is done 1/27/2015 Approved per Kevin Condie 1 year warranty |
| Engineering | 3/04/2014 Approved Brandon Wright 1/29/2015 Approved per Brandon Wright 1 year warranty |
| City Development Engineer | 03/05/2014 STREETS DEPT ONLY.. Per Jared Stewart 3/07/2014 Approved per Wes Jenkins |
| Landscaping | 3/07/2014 Approved Per Wes Jenkins |