[Cottonwood Phase 4 & 5]
Number: Grading-45797

Drawing of Record Submitted 5/20/2014
Electronic Drawing 5/20/2104
Final Grading Report 5/20/2014
Date Scheduled 5/21/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/27/2014 Approved per Kevin Condie 3/09/2015 Approved per Kevin Condie 1 year warranty Phase 4 & 5
Wastewater 5/27/2014 Approved per Kevin Condie 3/09/2015 Approved per Kevin Condie 1 year warranty Phase 4 & 5
Engineering 5/22/2014 Approved per Brandon Wright 3/11/2015 Approved per Brandon Wright 1 yr warranty Phase 5 3/25/2015 Phase 4 Corrections required per Brandon Wright Sidewalk settling by utility boxes 8/21/2015 1 yr warranty. Corrections required for sidewalk. 10/9/15 phase 4 verbal approval per Brandon Wright
City Development Engineer 5/22/14 - STREETS - approved per Jay Smith 6/02/2014 Approved per Wes Jenkins
Landscaping 5/23/2014 Approved per Craig Harvey.. Landscape not completed has Bond will require a reinspect
    
General Comments: