Drawing of Record Submitted |
11/22/2013 |
Electronic Drawing |
11/22/2013 |
Final Grading Report |
11/22/2013 |
Date Scheduled |
11/25/2013 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
12/05/2013 Approved per Trent Bowler.. Did Final everything is good
1/12/2015 Approved per Kevin Condie 1 yr warranty |
Wastewater |
12/05/2013 Approved per Trent Bowler.. Did Final everything is good
1/12/2015 Approved per Kevin Condie 1 yr warranty |
Engineering |
11/26/2013 Approved per Brandon Wright
1/02/2015 Corrections required per Brandon Wright.. 1yr warranty.. Roads are Failing
9/30/15 Corrections required per Brandon Wright... 1 yr warranty... some patches failing recently patched.
11/06/2015 Approved 1 yr warranty per Brandon Wright |
City Development Engineer |
2/12/2014 Approved per Wes Jenkins |
Landscaping |
2/12/2014 Approved per Wes Jenkins |
| |
General Comments: |
|