[Riverstone Phase 2]
Number: Grading-45804

Drawing of Record Submitted 11/22/2013
Electronic Drawing 11/22/2013
Final Grading Report 11/22/2013
Date Scheduled 11/25/2013
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/05/2013 Approved per Trent Bowler.. Did Final everything is good 1/12/2015 Approved per Kevin Condie 1 yr warranty
Wastewater 12/05/2013 Approved per Trent Bowler.. Did Final everything is good 1/12/2015 Approved per Kevin Condie 1 yr warranty
Engineering 11/26/2013 Approved per Brandon Wright 1/02/2015 Corrections required per Brandon Wright.. 1yr warranty.. Roads are Failing 9/30/15 Corrections required per Brandon Wright... 1 yr warranty... some patches failing recently patched. 11/06/2015 Approved 1 yr warranty per Brandon Wright
City Development Engineer 2/12/2014 Approved per Wes Jenkins
Landscaping 2/12/2014 Approved per Wes Jenkins
    
General Comments: