[Riverstone Phase 3]
Number: Grading -45803

Drawing of Record Submitted 11/22/2013
Electronic Drawing 11/22/2013
Final Grading Report 11/22/2013
Date Scheduled 11/25/2013
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/05/2013 Approved per Trent Baxter.. Did Final everything is good 1/12/2015 Approved per Kevin Condie 1 yr warranty
Wastewater 12/05/2013 Approved per Trent Baxter.. Did Final everything is good 1/12/2015 Approved per Kevin Condie 1 yr warranty
Engineering 11/26/2013 Approved per Brandon Wright 1/02/2015 Corrections required per Brandon Wright 1 yr Warranty Roads Failing 11/23/2015 Approved 1 yr warranty per Brandon Wright
City Development Engineer
Landscaping
    
General Comments: