| Drawing of Record Submitted | 8/28/2013 |
|---|---|
| Electronic Drawing | 8/28/2013 |
| Final Grading Report | 8/28/2013 |
| Date Scheduled | 9/03/13 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 9/03/2013 Approved per Dennis Wright 8/04/2014 Approved per Dennis Wright.. 1 year Warranty |
| Water | 09/03/2013 Approved per Carson Tait 1/12/2015 Approved Per Carson Tait.. 1yr warranty |
| Wastewater | 09/03/2013 Approved per Carson Tait 1/12/2015 Approved Per Carson Tait.. 1yr warranty |
| Engineering | 9/04/2013 Approved per Brandon Wright.. Note: Lots 25 & 26 need to be brought up to grade and drain channel needs to be constructed at time of 1 year warranty insepction. 9/04/2013 Approved per Wes Jenksin.. Note: Approved with condition that lots 25 &26 are raised to match pad elevations shown on construction drawings and that utility/drainage easement is construction between the two lots as shown on constructions drawings prior to building permit being issued for exterior lot 8/14/2014 Approved per Brandon Wright 1 year warranty |
| City Development Engineer | 9/03/2013 STREETS DEPT Only..Approved per Jared Stewart |
| Landscaping | 9/04/2013 Approved per Wes Jenkins |
| General Comments: | |