Drawing of Record Submitted |
1/21/2014 |
Electronic Drawing |
1/21/2014 |
Final Grading Report |
1/21/2014 |
Date Scheduled |
1/22/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
1/24/14 corrections required per Kevin C. Replace concrete around hydrant and meter box. Bring wire up through concrete at the end of road. Clean all concrete off hydrant and paint them to top of concrete. Need to check wire. Redo concrete collars on valve all of them. Open all valves not phase line valves.
1/27/2014 Approved per Kevin Condie
1/12/2015 Approved Per Kevin Condie 1 yr warranty |
Wastewater |
1/24/14 corrections required per Kevin C. Replace concrete around hydrant and meter box. Bring wire up through concrete at the end of road. Clean all concrete off hydrant and paint them to top of concrete. Need to check wire. Redo concrete collars on valve all of them. Open all valves not phase line valves.
1/27/2014 Approved per Kevin Condie
1/12/2015 Approved Per Kevin Condie 1 yr warranty |
Engineering |
1/23/2014 Approved per Brandon wright.. Letter from Agec on file with Final on pad requirement
1/07/2015 Approved per Brandon Wright 1 yr warratny |
City Development Engineer |
1/23/2014 Approved per Jared Stewart STREETS DEPT ONLY
1/31/2014 Approved per Wes Jenkins |
Landscaping |
1/31/2014 Approved per Wes Jenkins |
| |
General Comments: |
|